š Overview
Measuring the drawings is only half the job. The quantities still have to get into the estimate, and that's where mistakes creep in. A wall length copied with the wrong unit. A count typed into the wrong line. A takeoff that was updated after the numbers were keyed in, so the estimate no longer matches the plans.
Send to Estimate moves your takeoff measurements straight into an estimate on the same lead or project. You open the Inventory panel from the takeoff package, give each measurement a cost code and unit cost, tick the rows you want, and pick the estimate. Structur adds one estimate line per measurement, with the quantity and unit from the takeoff.
Each row keeps a status, so you can see at a glance which measurements are still Draft and which are already Sent To Estimate.
š Understanding Send to Estimate
ā” What It Does
Send to Estimate allows you and your team to:
See every measurement in a package in one table, with its quantity and unit
Assign a cost code to each measurement from the Structur Standard list, your Custom Codes or your Saved Items
Enter a unit cost and see the total cost straight away
Choose which measurements to send with a checkbox on each row
Add the lines to a Draft estimate, or create a new estimate on the spot
Place the lines in a group and subgroup of the estimate if you want
Track what's been sent with the Draft and Sent To Estimate statuses
š When to Use It
Send to Estimate is most valuable when you want to:
Price a job from the quantities you measured on the drawings
Avoid retyping lengths, areas and counts into an estimate
Start a new estimate from a finished takeoff
Check which measurements have already made it into the estimate
š Step-by-Step Instructions
1. Open the Inventory Panel
Open a lead or project and click Takeoff in the module bar along the top (under Preconstruction)
Open the takeoff package
Click Send to Estimate in the package header
The Inventory panel opens along the bottom of the page. It has one row per measurement, with the columns Output (the measurement name), Quantity, Unit, Cost Code, Unit Cost, Total Cost and Status. New rows start as Draft.
Note: Send to Estimate is in the header of every package, whatever its status. You don't need to mark the package complete first.
2. Add a Cost Code
Click the Cost Code cell on a row ("Click to select a Cost Code...")
In Replace Cost Code, pick a tab: Structur Standard, Custom Codes or Saved Items
Search for the code, or filter with All Divisions
Click the code, then click Save Cost Code
Click Cancel to close the window without changing the code.
3. Enter the Unit Cost
Click the Unit Cost cell on the row
Type the cost per unit
Total Cost updates as you type. For example, a 10 ft measurement at $10 shows a total of $100.00.
Note: As the footer of the panel says, you can click any cell to edit it. That includes Output, so you can rename a measurement here, and Unit. Quantity can't be edited.
4. Choose the Rows to Send
Tick the checkbox on each row you want to send, or the checkbox in the header row to select them all
Check the counter, for example "1 of 8 selected"
Click Send to Estimate at the top of the panel
The Send to Estimate button stays greyed out until you tick at least one row. You can send up to 100 rows at a time. Click the X to close the panel.
5. Pick the Estimate
The Send to Estimate window shows how many items you're sending and the sheet they come from.
Under Select Estimate, pick the estimate. Only Draft estimates on this lead or project are listed
If you need a new one, click + New Estimate, create it as usual, and you'll come back with it selected
If you want the lines in a particular part of the estimate, pick a Select Group (optional) and a Select Subgroup (optional)
Click Add to Estimate
Click Cancel to go back without sending anything.
Note: If the estimate you want isn't listed, it isn't a Draft. Send to a Draft estimate, or create a new one with + New Estimate.
6. Check the Result
You'll see "Measurement updated successfully", and each row you sent changes to Sent To Estimate in green. The package's own status doesn't change.
Open the estimate to see the new lines. Each measurement becomes one line with:
The cost code you picked
The measurement name as the description, for example Length_2
The quantity and unit from the takeoff
Your unit cost and the subtotal
If you didn't pick a group, the line is added without a group.
ā Best Practices
Rename measurements before you send them -- the measurement name becomes the line description, so "North Wall Framing" reads far better in the estimate than Length_2.
Set the scale before you measure -- the quantities go into the estimate as measured, so a wrong scale means a wrong price.
Add cost codes in the Inventory panel first -- the code goes into the estimate with the line, so you don't have to recode each line there. A row sent without a cost code gets one matched to its takeoff group name, which may not be the code you want.
Pick a group when the estimate is already organised -- without one, the lines are added ungrouped and you'll have to tidy them up in the estimate.
Check the Status column before sending again -- rows already marked Sent To Estimate are in the estimate, so look there before you send the same row twice.
Keep the estimate in Draft while you're pricing -- only Draft estimates show up in Select Estimate.
ā Common Questions
Q: Where is the Inventory?
A: Click Send to Estimate in the takeoff package header. The Inventory panel opens along the bottom of the page. There's no separate Inventory button or tab.
Q: Why can't I click Send to Estimate in the panel?
A: Tick at least one row first. The button stays greyed out until a row is selected.
Q: Why isn't my estimate in the list?
A: Select Estimate only lists the Draft estimates on this lead or project. Send to a Draft estimate, or click + New Estimate to create one.
Q: What does the line in the estimate look like?
A: One line per measurement, with the cost code you picked, the measurement name as the description, the quantity and unit from the takeoff, and your unit cost and subtotal.
Q: Does sending to an estimate change the takeoff package's status?
A: No. Only the rows you sent change, from Draft to Sent To Estimate. Set the package status yourself, or click Mark as Complete in the header.
Q: Can I start a new estimate from my takeoff?
A: Yes. In the Send to Estimate window, click + New Estimate. Create the estimate as usual, and you'll come back to the window with the new estimate selected. Then click Add to Estimate.
Q: What's the difference between Takeoff and the estimate?
A: Takeoff is where you measure quantities on your drawings. The estimate is where you price the job. Send to Estimate carries the quantities from one to the other.
ā ļø Common Mistakes to Avoid
ā Don't | ā Do |
Send measurements with default names like Length_2 | Rename them first so the estimate lines are easy to read |
Look for your estimate in Select Estimate when it's no longer a Draft | Send to a Draft estimate, or create one with + New Estimate |
Send rows without a cost code or unit cost | Fill in Cost Code and Unit Cost in the Inventory panel first |
Skip the group and leave the estimate to sort itself out | Pick a group and subgroup when your estimate is already organised |
Send a row again without checking the estimate | Check the Status column and the estimate before sending a row twice |
Expect the package to be marked complete after sending | Click Mark as Complete in the header when the takeoff is done |
