đ Overview
Most estimates go wrong in the spreadsheet. A formula gets dragged one row too far. Overhead gets applied twice. A sub's number gets updated in one tab but not the other, and the price you send no longer matches the cost you built. You only find out when the job is already signed and the margin isn't there.
Estimates in Structur replaces that spreadsheet. You build the estimate inside a lead or project from cost codes, organise it into groups and subgroups, and set internal markup, overhead, profit and tax. Structur does the maths and keeps a live summary of direct cost, markup, overhead, profit, tax and total price. When you're ready, the same estimate feeds the proposal your client sees, so the price you built is the price you send.
Each estimate can have revisions, so you can rework a price without losing the version you already sent. Anything you build often can be saved as a template or as Saved Items and reused on the next job.
đ Understanding Estimates
⥠What It Does
Estimates allows you and your team to:
Build an estimate from cost codes -- pick from the Structur Standard library, your own Custom Codes, or your Saved Items
Organise lines into groups and subgroups -- group lines by trade, area or phase, with descriptions on each group
Price each line -- quantity, unit, unit cost and an optional internal markup percentage
Apply overhead, profit and tax -- set per estimate, with company defaults so you don't retype them every time
See the full price as you build -- a live summary of Total Price, Direct Cost, Internal Markup, Overhead, Profit and Tax, plus a cost breakdown chart
Create revisions -- rework the price as a new revision while the earlier one stays on record
Reuse your work -- save an estimate as a template, or save lines and groups to Saved Items
Import lines from a spreadsheet -- bring lines in from a CSV file instead of typing them
đ When to Use It
Estimates is most valuable when you want to:
Turn a qualified lead into a detailed, cost-code-based price
Keep overhead and profit consistent across every job your team prices
Rework a price after a scope change without losing what you already sent
Start from a template so similar jobs take minutes, not hours
Hand the client a proposal that matches your estimate to the cent
đ Step-by-Step Instructions
1. Open Estimates
Open the lead or project
Click Estimates in the module bar along the top, under Preconstruction
The list shows every estimate for this lead or project. The four cards along the top are Draft, Edits Requested, Pending Approval and Approved. Each shows the total of those estimates and how many there are. The tabs below them filter by the status of each estimate's proposal: All, Draft, Pending Approval, Approved, Declined, Edits Requested and Voided. You can search with Search estimates..., switch between List and Grid, and open any estimate with Open. The three-dot menu on a row has Edit, New Revision and Delete.
The buttons at the top right are Export, Manage Templates, Settings and New Estimate. On a narrower window, some of them move into an Actions menu.
Note: Every revision is its own row, so an Original and a Rev 1 of the same job both count in the cards. Declined and Voided estimates aren't in any card.
2. Create a New Estimate
Click New Estimate in the top right
In Create New Estimate, click Start From Scratch or Choose A Template
If you chose a template, pick it from the list (use the All, Company and Public tabs or Search templates...), then click Continue
Fill in Title (it starts as the lead or project name, so type over it or add to it), Estimator, Overhead % and Profit %, and Square Feet if you know it. Number is filled in for you.
Leave the toggle Compound profit on top of overhead on or off (see step 5)
Turn on Enable tax collection if this job is taxable, then enter the Tax Rate % and decide whether to turn on Apply tax on top of overhead and profit
Click Create Estimate
You'll see "Estimate created" and the new estimate opens.
Note: Square Feet is optional when you create the estimate. If you leave it blank, the estimate is created with 0 square feet. Estimate Settings at the top of the estimate does require it, so when you change other details there later, enter the square footage, or 1 if square footage doesn't apply to this job.
Overhead %, Profit %, the estimator, the compound toggle and the tax toggle start from your estimate defaults (step 9), so you only change them when this job is different.
Note: Structur AI can also build an estimate for you. See Structur AI.
3. Add Cost Codes and Lines
Use the buttons under the table:
Add Cost Codes adds a blank line at the bottom of the table. Click Click to type a cost code or name... and start typing, such as "concrete". The Cost codes list opens, starting with your Saved Items, and narrows as you type. Tick one or more codes and click Add. Create Cost Code in the same list makes a new code.
Add Group adds an empty group.
Search cost codes... above the table finds lines already in the estimate.
New lines are added at the bottom of the estimate, or inside the group you added them from. Lines you pick from Saved Items keep the group and subgroup you saved them in.
Note: Structur Standard codes end in a letter that tells you the cost type: L Labor, M Materials, S Subcontractors, E Equipment, O Other. If you're supplying materials only, use the M version of the code.
For each line, enter the Qty, choose a Unit, and enter the Unit cost. The Subtotal fills in automatically, and Markup takes the line's internal markup percentage. The columns are Cost code, Description, Qty, Unit, Unit cost, Subtotal, Markup, Allowance, Total, $/sq ft² and Sale price. The button at the right end of the headings chooses which columns show. Tick Allowance to mark the line as an allowance, and tick Tax to make it taxable (the Tax column only shows when tax is enabled on the estimate). Changes save as you go, so there's no Save button.
Important: Tax is off on every new line, even when tax is enabled on the estimate. Until you tick it, that line adds no tax, and if no lines are ticked the Tax total stays $0.
4. Organise Groups and Subgroups
Click the + on a group to add a New Cost Code or a New Subgroup inside it
Use the three-dot menu on a group to Rename, Delete, Duplicate or Save to Saved Items. Drag a group by its handle to move it
Use the three-dot menu on a line to Delete, Move to group, Duplicate or Save to Saved Items (Move to group shows once the estimate has a group)
Click the arrow next to a group to expand or collapse it
Tick several lines to use the bar at the bottom: Duplicate, Delete or Move to group
Add a description to any line, group or subgroup in its Add description... field
Click the comment icon at the far right of a line to open its Comments panel. Type in Add a comment and click the send button. Each comment shows who wrote it and when, and you can edit your own with the pencil icon.
Note: Comments belong to a single line, so your team can discuss a price where it sits. Currently, the comment icon only opens the panel for lines that aren't inside a group.
Important: Deleting a line, group or subgroup inside an estimate can't be undone, and Restore Mode doesn't bring it back. If you're about to remove a lot of work, create a New Revision first so the current version stays on record.
5. Set Markup, Overhead, Profit and Tax
Structur prices every line in the same order:
Subtotal = Qty x Unit cost
Internal Markup = the line's markup % x Subtotal. This gives the line Total.
Overhead = Overhead % x the line Totals
Profit depends on the compound toggle. On: Profit % x (line Totals + Overhead). Off: Profit % x the Subtotals only, before markup and overhead.
Tax depends on Apply Tax on top of Overhead and Profit. Off: Tax Rate x the Subtotals of lines with Tax ticked, before markup. On: Tax Rate x the full pre-tax price of those lines, including their markup, overhead and profit.
Example: a taxable line of 153 at $4.53, with 11.8% markup, 10% overhead, 10% compounded profit and 5% tax:
Subtotal $693.09, Internal Markup $81.78, line Total $774.87
Overhead $77.49
Profit $85.24, which is 10% of $774.87 + $77.49
Tax $34.65, which is 5% of the $693.09 subtotal
Total Price $972.25
Internal markup is set per line as a percentage. Overhead, profit and tax are set for the whole estimate. To change them after the estimate is created, click Settings at the top of the estimate.
Note: The Tax tile in the summary shows the tax amount with your rate under it (for example 5%). The Cost Breakdown chart shows tax as a share of the total price (for example 3.32%), so the two percentages will differ.
6. Read the Summary
The top of the estimate shows Total Price (and the price per ft²), Direct Cost, Internal Markup, Overhead, Profit and Tax (Not Enabled when the estimate has no tax). Below that, Estimate Details lists the title, revision, estimator, square feet, overhead and profit percentages, proposal status and created date. The Cost Breakdown chart shows how the total splits. Click Hide Summary to give the table more room.
In the table, Sale price shows what each line and group sells for once overhead, profit and tax are spread across them. The footer shows SUBTOTAL, TOTAL, $/SQ FT² and TOTAL SALE PRICE, and TOTAL SALE PRICE always equals the Total Price at the top.
7. Send It as a Proposal
Every estimate has a proposal. Click View Proposal at the top of the estimate to open it. The first time you open the proposal for a new estimate, Structur shows Choose a Template so you can pick a proposal template and click Use Template, or click Start Blank. A revision's proposal opens straight away.
The proposal's pricing table comes from the estimate's groups, subgroups and lines. Overhead and profit can be distributed into the line prices, so unit prices on the proposal can show more than two decimal places (for example $6.1281).
Note: The estimate stays editable after the proposal is sent, and your client's proposal link shows the current prices. If you need to change a price the client has already seen, create a New Revision so the sent version stays on record.
Once the client approves the proposal, the estimate is locked. You can still Download it, create a New Revision, Save As Template or View Proposal, but you can't edit lines. A Declined or Voided estimate shows the same four buttons at the top.
8. Create a Revision
Open the estimate
Click New Revision
Structur creates the next revision straight away with all the lines copied. There's no confirmation step. The first version is labelled Original, then Rev 1, Rev 2 and so on. Each revision is its own row in the list, with its own number and its own proposal.
You can also create a revision from the three-dot menu on the estimate's row in the list.
9. Set Your Estimate Defaults
On the Estimates list, click Settings at the top right (on a narrower window it's under Actions)
Set Default Overhead %, Default Profit % and Default Estimator
Choose whether Compound profit on top of markup and overhead and Enable tax collection by default start on
Choose whether to Show $/sq ft column and Show internal markup column
Click Save Changes
These are company-wide defaults. Overhead, profit and the compound setting are the same ones shown in Settings > Company, so changing them in either place changes both. New estimates start from these values, and estimates you've already created keep their own.
10. Use Templates
Open the estimate and click Save As Template at the top
In Save as Template, check the Template Name (it starts as the estimate title)
Click Save Template
You'll see "The template <name> is being created! It will be available when you create a new Estimate."
To use a template, click New Estimate, click Choose A Template, pick the template and click Continue. The form shows the template at the top (click Change to pick another), and the rest is the same as step 2. The new estimate copies the template's groups, subgroups, cost codes, quantities, unit costs and internal markup. Overhead %, Profit % and tax come from the form, which starts at your estimate defaults, not from the template. Change them on the form if this job needs the template's numbers.
Click Manage Templates on the Estimates list to rename a template (pencil icon), switch it Active or inactive, Edit Template, or delete it (trash icon).
Important: Deleting a template from Manage Templates asks you to confirm, then removes it from the list straight away. The confirmation says it can't be undone.
Note: The Public tab of the template list shows templates from Structur, such as "Structur Commercial Template (Public)". These don't appear in Manage Templates.
11. Delete or Restore an Estimate
Open the estimate and click Settings
Click Delete, then confirm
The confirmation reads "Are you sure you want to delete the estimate ... This action cannot be undone." The list doesn't update until you refresh the page.
If Enable Restore Mode is on in Settings > Company, the deleted estimate stays in the list struck through, with a Restore button in place of Open. Click Restore to bring it back. If Restore Mode is off, the estimate is removed from the list after you refresh, with no Restore button.
Important: With Restore Mode off, a deleted estimate can't be recovered. With Restore Mode on, you can restore a deleted estimate for 60 days. Check the setting with your admin before deleting anything you might need.
â Best Practices
Set your estimate defaults once -- default overhead, profit and tax mean every estimator starts from the same numbers, so two people pricing the same job don't land on different margins.
Pick the right cost type -- choosing the L, M, S, E or O version of a code keeps your budget and reports split correctly between labor, materials, subs, equipment and other.
Create a revision before big changes -- deleting lines and groups can't be undone, and a revision keeps the old version one click away.
Revise instead of editing a sent estimate -- edits change the price on your client's live proposal link, and a revision keeps a clean record of what you sent.
Save repeat scopes to Saved Items or a template -- a bathroom remodel or a standard slab you price every month should take one click, not twenty lines.
Remember revisions are counted in the totals -- when you read the cards on the Estimates list, check whether several revisions of the same job are inflating them.
Check the Tax setting before you send -- whether tax applies to overhead and profit can move the price by hundreds of dollars on a large job.
â Common Questions
Q: What do the L, M, S, E and O letters on cost codes mean?
A: They're the cost type: L Labor, M Materials, S Subcontractors, E Equipment, O Other. Pick the one that matches what you're pricing. For example, use the S version when a sub is doing the work.
Q: I can't find my own cost code when I add a line.
A: Type its code or name in a blank line, and pick it from the Cost codes list. You manage your custom codes in Settings > Cost Codes.
Q: How do internal markup, overhead and profit stack?
A: Internal markup is added to each line first. Overhead is then a percentage of the marked-up line totals. With Compound the profit calculation on top of internal markup and overhead on, profit is a percentage of the line totals plus overhead. With it off, profit is a percentage of the raw subtotals only. On the same $3,868 of cost, 10% profit came to $468 compounded and $387 not compounded. Step 5 has a worked example.
Q: Can I leave one line, such as a contingency, out of overhead or profit? Can they be a flat dollar amount?
A: Currently, no. Overhead and profit apply to the whole estimate, so every line carries them, and they're always percentages. Setting a line's internal markup to 0% doesn't change this, because internal markup is separate from overhead and profit. To keep a line out of overhead and profit, price it on a separate estimate with 0% overhead and profit. To add a fixed fee, add it as its own line with the amount as the unit cost.
Q: Why is my tax a different percentage in the summary and the chart?
A: The Tax tile shows the tax amount with your tax rate under it. The Cost Breakdown chart shows tax as a share of the total price. Tax is also charged only on the subtotal of lines with Tax ticked, unless Apply Tax on top of Overhead and Profit is on.
Q: Why is my proposal total a few cents different from my estimate?
A: When overhead and profit are distributed into line prices on the proposal, unit prices can run to several decimal places, and the rounding can move the total by a few cents. This is expected. The proposal is the price your client sees and approves.
Q: I sent the proposal and then edited the estimate. Did my client's price change?
A: Yes. The proposal link always shows the estimate's current prices until the proposal is approved. To change a price after sending, create a New Revision so the version your client saw stays on record.
Q: My estimate is approved. How do I change it?
A: An approved estimate is locked, but you can still click New Revision on it. Structur creates the next revision as an editable Draft with all the lines copied. The approved estimate and its proposal stay Approved. The revision gets its own proposal, which you send to the client when it's ready.
Q: Can I get back a line or group I deleted?
A: Currently, no. Deleted lines and groups inside an estimate can't be restored, even with Restore Mode on. Restore Mode only brings back whole estimates. Before big changes, create a New Revision, or save groups you reuse to Saved Items.
Q: Can I have more than one estimate on the same project?
A: Yes. Create as many as you need, for different scopes or pricing options. Each estimate has its own proposal.
Q: Can I copy an estimate to a different project?
A: Click Save As Template on the estimate, then on the other project click New Estimate and choose Choose A Template. The groups, subgroups, lines, quantities, unit costs and internal markup come across. Overhead %, Profit % and tax come from the new estimate's form, so set them there if they should match the original.
Q: Why does my Budget look different from my estimate?
A: The Budget tracks your costs, not your selling price. Its Original Estimate is the estimate's Subtotal (Qty x Unit cost), before internal markup, overhead and profit. The estimate and proposal show the full selling price, so the difference is your margin, not an error. The Budget stays empty until the proposal is approved, then fills in from the estimate.
Q: Is there a Save button?
A: No. Every change saves automatically as you type or move to the next field.
â ď¸ Common Mistakes to Avoid
â Don't | â Do |
Leave Square Feet blank, then wonder why Estimate Settings won't save | Enter the square footage in Estimate Settings, or 1 if it doesn't apply |
Edit an estimate after the proposal is sent | Create a New Revision so the sent price stays on record |
Delete groups to "start over" on a priced estimate | Create a New Revision first, because deleted lines and groups can't be restored |
Use the L code for work a sub is doing | Use the S version so costs land in the right category |
Retype overhead and profit on every estimate | Set Default Overhead % and Default Profit % in the Estimates Settings |
Read the estimate cards as your pipeline value without checking revisions | Remember every revision is counted as its own estimate |