đ Overview
A homeowner calls and asks what their addition will cost. You can tell them you'll get back to them after a full estimate, which takes days, or you can guess. A guess that's too low sets an expectation you can't meet. A guess that's too high loses the job before it starts. Either way, a lot of estimating time goes into leads that were never going to fit the budget.
Ballparks give you a credible price range in minutes. You set your own price per square foot once in Ballpark Settings, by project type and complexity. Then, on any lead or project, you enter the square footage, rate how complex each part of the job is, add your markup, and Structur works out a range. You can preview it as your client will see it and send it to them for a quick yes.
A ballpark isn't an estimate. It's a fast check that the client's budget and your pricing are in the same place before you spend hours on a detailed estimate. When the client agrees to the range, the next step is a full estimate in Estimates.
đ Understanding Ballparks
⥠What It Does
Ballparks allows you and your team to:
Set your price per square foot for each group of work, at four complexity levels, in Ballpark Settings
Keep separate pricing by project type -- for example ground-up work and renovations
Create a ballpark from square footage and a project type -- the groups and rates fill in for you
Rate the complexity of each group -- None, Simple, Intermediate or Advanced
Add a one-off group to a single ballpark without changing your settings
Add a markup and get a range of plus or minus 10% around the total
Preview what your client will see before you send anything
Track every ballpark across your leads and projects as Draft, Sent or Approved
đ When to Use It
Ballparks are most valuable when you want to:
Give a lead a price range on the first call or the first site visit
Find out early that a client's budget doesn't match your pricing
Compare a few scenarios for the same lead, such as different sizes or finish levels
Get a client's agreement on a range before you start a detailed estimate
đ Step-by-Step Instructions
1. Open Ballparks
Open a lead or project
Click Ballparks in the module bar along the top (under Preconstruction)
The top of the page has Export, Settings and New Ballpark.
Note: If you don't see Ballparks in the module bar, it may be hidden. Use Show/Hide Features at the right end of the bar to turn it back on.
2. Set Up Your Project Types
Set up Ballpark Settings before your first ballpark. Your rates are what every ballpark is built from.
On the Ballparks page, click Settings. The Ballpark Settings page opens.
Click Manage Project Types in the top right
Type a name in the Add New field and click Add New Project Type
Drag a project type by its six-dot handle to change the order
Click Close
The project type selector in the top right switches between your project types. The page always opens on the first one in the list.
Note: A new project type starts empty, with "No groups found". Add its groups and rates in the next step, or ballparks of that type will come out at $0.00.
Important: Deleting a project type (the red trash icon when you hover over it in Manage Project Types) can't be undone, and its groups and rates go with it. Only delete a project type you no longer price.
3. Set Your Groups and Rates
Each project type has a table of groups, such as "03 - Concrete" or "26 - Electrical", with a Price per Square Foot for None, Simple, Intermediate and Advanced.
Pick the project type in the selector at the top right
Double-click a rate to edit it
Type the new rate and press Enter or Tab
To add a group, click + New Group, then double-click "New Group" to rename it
Changes save on their own. There's no Save button on this page.
To remove a group, click the three-dot menu on its row and choose Delete.
Note: None can hold a rate too. Most groups leave None at $0.00, so a group rated None adds nothing. If some work is always needed, such as general conditions, give it a None rate.
Important: Rate changes apply straight away to every ballpark of that project type, including ballparks you've already sent. Your client's link shows the new range the next time they open it, with no notice to you or them. A new group, on the other hand, only appears on Draft ballparks of that type.
4. Create a Ballpark
Click New Ballpark
In Create New Ballpark, enter a Title, for example "Smith Kitchen Remodel"
Check the Number. It's filled in for you.
Enter the Square Feet
Choose the Project Type
Click Create Ballpark
You'll see "Ballpark created", and the new ballpark opens with the groups and rates from that project type.
Note: Nothing in Create New Ballpark is required, so you can create the ballpark first and fill in the details on its page. The Title is required there: Save stays greyed out until the ballpark has a title.
Note: Each lead or project numbers its own ballparks, starting at 0001. You can create as many ballparks on one lead as you need.
Note: Structur AI can also fill in a ballpark for you. See Structur AI.
5. Rate Complexity and Add Markup
The page shows the BALLPARK RANGE at the top, then your details: Title, Square Feet, Project Type, Date and Markup %. Below them, COST / SQ FT and TOTAL COST update as you work.
In Cost Breakdown, choose a Complexity for each group: None, Simple, Intermediate or Advanced
Enter your Markup %. Decimals such as 16.5 are fine.
Pick a Date if you want one on the ballpark
Add any Notes
Click Save
The header shows Unsaved changes until you click Save, then Saved. This includes complexity changes.
Note: Changing the Project Type swaps the Cost Breakdown for that project type's groups and rates. Groups you added with + New Group stay. Switch back before you click Save and the original groups return.
Note: If you leave with unsaved changes, an Unsaved Changes window warns you. Click Cancel to stay and save, or Discard to throw the changes away.
6. Understand the Range
Structur works the range out for you:
Each group's total is its rate for the chosen complexity times the square feet
TOTAL COST adds up the groups, before markup
The markup is added to the total
The range runs from 10% below to 10% above that marked-up total
For example, a total cost of $12,000 with a 16.5% markup comes to $13,980. The range is $12,582.00 - $15,378.00.
You can't type the range in. To move it, change the complexity ratings, the Markup %, the square feet, or your rates in Ballpark Settings.
7. Add a Group to One Ballpark
Use this for work that's specific to one job, such as a pool or a detached garage.
Click + New Group at the bottom of Cost Breakdown
Enter a Group name and a Base $/sf rate
Click Add
The group shows Manual in place of a complexity rating, and it saves straight away. It belongs to this ballpark only and doesn't appear in Ballpark Settings.
8. Choose What Your Client Sees and Preview
Two switches control what goes on the client's page:
Show to client on Notes is off by default
Show to client on Cost Breakdown is on by default
Click Preview to open the client's view in a new browser tab. It shows the range, a short note that the price is based on preliminary scope, the date, square footage, project type, and the notes and cost breakdown if you've chosen to show them. The cost per square foot in the client's breakdown includes your markup.
Note: Currently, Preview also shows a Looks Good button that says your contractor has been notified. Clicking it in Preview does nothing and the ballpark stays Draft. Only your client's click on a sent ballpark approves it.
9. Send It to Your Client
Click Save if the header shows Unsaved changes
Click Send to Client
In Send Ballpark to Client, choose Send via Email
Check the Name and Email (both required, filled in from the client on the lead), and the Phone, Subject and Message
Click Send to Client
You'll see "Email sent to client", and the ballpark's status changes from Draft to Sent. Your client gets a link to the ballpark page.
The Send Ballpark to Client window also has Download PDF ("Export a print-ready document") and the ballpark's link with a Copy button, if you'd rather share it yourself.
Note: If your Leads board shows the Ballpark Sent stage, sending a ballpark moves the lead into it. See Leads Pipeline.
10. Work With the Ballparks List
The cards at the top are Draft, Sent and Approved, each with how many ballparks are in that status. The tabs All, Draft, Sent and Approved filter the list. The list shows Number, Title, Status, Sq Ft, Date, Range and Prepared By.
Switch between List and Grid above the table, or type in Search ballparks.... A Grid card shows the lead, client, project type, range, created date and whether the email was Sent or Not sent.
Click Open on a row to open the ballpark
The three-dot menu on a row has Edit and Delete. Edit opens Edit Ballpark, where you change the Title and click Update
Export has Export PDF and Export CSV
To see ballparks across every lead, click the lead name at the top to open the dropdown, click Show All Leads and go to Ballparks. The same view is available for All Projects. In these views, click the filter icon next to search and turn on Include completed projects to see ballparks on completed jobs.
These views add a Lead/Project column, because every lead and project starts its numbering at 0001.
11. Delete or Restore a Ballpark
Click the three-dot menu on the ballpark's row
Choose Delete
The ballpark is deleted straight away, with no confirmation, and you'll see "Ballpark "<title>" has been deleted successfully". If Enable Restore Mode is on in Settings > Company, the row stays in the list greyed out and struck through, with Restore in place of Open. Click Restore to bring it back with its number, status and data. You'll see "Ballpark "<title>" has been restored". If Restore Mode is off, the row disappears.
Important: There's no confirmation, so check the row before you click Delete. Deleted ballparks are kept for 60 days. If you delete one by mistake while Restore Mode is off, ask an admin to turn on Enable Restore Mode, restore it, then turn Restore Mode off again. A client link to a deleted ballpark shows a "page could not be found" message.
â Best Practices
Base your rates on finished jobs -- a ballpark is only as good as your price per square foot. Use real costs from your last few similar projects.
Set up a project type for each kind of work you price -- a renovation and a ground-up build cost very differently per square foot, and one shared table makes both ranges wrong.
Rate complexity honestly -- rating everything Simple to land a lower number backfires when the detailed estimate comes in much higher.
Click Save before you leave the page -- complexity, markup, notes and date changes are lost if you discard them.
Change rates on purpose -- a rate change reaches ballparks you've already sent, so your client's range can move without warning.
Name ballparks after the job -- a clear title is easier to find in Search ballparks... and in All Leads.
Move to an estimate once the client agrees -- a ballpark has no line items, so build the detailed estimate in Estimates before you commit to a price.
â Common Questions
Q: Can I type in my own range or widen it?
A: No. The range is always 10% below and above the total with markup. To raise or lower it, change the complexity ratings, the Markup %, the square feet, or your rates in Ballpark Settings.
Q: Can I show my client one number instead of a range?
A: Currently, no. Ballparks always show a range. For a firm price, build an estimate and send a proposal.
Q: Why is my range $0.00 - $0.00?
A: Check that Square Feet has a number in it, and that the groups have rates above $0.00 for the complexity you chose. A new project type starts with no groups, so add groups and rates in Ballpark Settings first.
Q: I changed a rate in Ballpark Settings. Does it change my existing ballparks?
A: Yes. Rate changes update every ballpark of that project type, including sent ones and the client's link. A new group added in settings only appears on Draft ballparks of that type, not on sent ones.
Q: How do I change the price per square foot inside one ballpark?
A: Change the Complexity for that group, or add a group with its own Base $/sf using + New Group at the bottom of Cost Breakdown. To change the rate itself for every ballpark, edit it in Ballpark Settings.
Q: Why didn't my complexity change stick?
A: Complexity changes need Save, like every other field on the page. If you click Discard on the Unsaved Changes window, the change is undone.
Q: How is a ballpark different from an estimate?
A: A ballpark uses square footage and your rates to give a quick range. An estimate is a detailed, line-by-line price that becomes your proposal. Nothing carries over from a ballpark to an estimate, so create the estimate in Estimates when you're ready.
Q: What can I change with Edit in the list?
A: Only the title. To change anything else, click Open and edit the ballpark itself.
â ď¸ Common Mistakes to Avoid
â Don't | â Do |
Create ballparks before setting your rates | Set up your project types, groups and rates in Ballpark Settings first |
Expect the range to be editable | Adjust complexity, Markup % or square feet to move it |
Leave the page without clicking Save | Watch for Saved in the header before you go |
Change rates casually after sending ballparks | Remember rate changes reach sent ballparks and your client's link |
Give every ballpark a generic title | Name it after the client or job so it's easy to find |
Treat an approved ballpark as a price commitment | Follow it with a detailed estimate and proposal |
