Skip to main content

Pipeline Stages

Covers Leads Settings and Projects Settings: renaming, recolouring, adding, reordering, hiding and deleting stages, and the stages that move leads automatically, including Ballpark Sent.

Written by Support

šŸ“‹ Overview

Every contractor sells and builds a little differently. One team sends a ballpark before they ever meet the client. Another goes straight into design. When the columns on your board don't match how you actually work, people stop updating them -- and a board nobody updates stops telling you anything.

Pipeline Stages are the columns on your Leads and Projects boards. Each pipeline has its own list, opened from the Settings button on that page. You can rename any stage, add your own, set its colours, drag stages into order, and hide the ones you don't use. Some lead stages move leads for you, and most of them show a lightning bolt on the board.

Hiding and deleting have side effects on the leads and projects inside a stage. Read steps 5 and 6 before you clean up your list.


šŸ” Understanding Pipeline Stages

⚔ What It Does

Pipeline Stages allow you to:

  • Rename any stage, including the stages marked (App Default)

  • Add custom stages with your own name and colours

  • Reorder stages by dragging, and the board columns follow

  • Hide stages you don't use, so their columns leave the board

  • Delete custom stages you no longer need

  • See which stages move leads automatically by the lightning bolt on the column

šŸ“… When to Use It

Pipeline Stages are most valuable when you want to:

  • Set up your pipelines to match your sales and build process

  • Rename a stage into the words your team already uses

  • Add a step your process has and the defaults don't

  • Clean up a board with columns nobody uses


šŸ“ Step-by-Step Instructions

1. Open Stage Settings

  1. Click Leads (or Projects) in the left sidebar

  2. Click Settings in the top bar

Leads Settings (or Projects Settings) opens on the right, with the STAGES list: "Stages on the Leads board and list". Each stage has a drag handle, its colour, its name, an edit (pencil) button, a show / hide switch, and either a lock or a trash icon. Built-in stages are marked App Default.

The note at the top reads: "Changes save as you make them. A hidden stage stays out of the board and the list; App Default stages can't be deleted." Click Done to close the panel.

Note: Leads and Projects each have their own stage list. Open Settings from the Leads page for lead stages and from the Projects page for project stages.

Note: Managing stages needs Full Access on the Leads Pipeline or Projects Pipeline row in Settings > Permissions. Collaborate can't manage settings.


2. Rename or Recolour a Stage

  1. Click the pencil next to the stage

  2. In Edit Stage ("Name the stage and pick its color"), change the Stage Name and pick a Color: "Pick a preset, or drag for any color." The Preview shows how it will look

  3. Click Save Stage

App Default stages can be renamed and recoloured too.


3. Add a Custom Stage

  1. Click New Stage at the bottom of the list

  2. Type a Stage Name (required) and pick a Color

  3. Leave Show On The Board on to show it as a column

  4. Click Save Stage

The new stage is added at the end of the list, and you'll see "The project stage <name> was created successfully." Drag it to where it belongs (step 4).


4. Reorder Stages

Drag a stage by its handle to a new position in the list. The board columns follow the same order.


5. Hide or Show a Stage

Turn the switch at the end of a stage's row off to hide it, or on to show it. You can also use Show On The Board in Edit Stage.

A hidden stage's column and its cards leave the board. Currently, leads in a hidden stage still show in List view with that stage name, even though the panel says hidden stages stay out of the list. Move any leads or projects out of a stage before you hide it, so they don't drop off the board.


6. Delete a Custom Stage

Only custom stages have a trash icon. App Default stages have a lock instead and can't be deleted: hide them if you don't use them.

  1. Click the trash icon next to the custom stage

  2. In "Delete <stage name>?" ("Are you sure you want to delete the stage ... This action cannot be undone."), click Delete

Important: There's no warning when the stage still has cards in it. Its leads move to New Lead (projects move to New Project). Move them to the stage you want first.


7. Know Which Stages Move Leads for You

On the Leads board, a lightning bolt sits on the columns that move leads for you. Click it to see what it does:

  • New Lead -- "New leads will move into this stage if you set up the embed form."

  • Estimating -- "Leads will automatically move into this stage when you create the first estimate."

  • Proposal Sent -- "Leads will automatically move into this stage when the Proposal is sent."

Ballpark Sent moves leads too. When the stage is shown, sending a ballpark to the client moves the lead into Ballpark Sent. It only moves leads forward, so a lead already in Estimating or Proposal Sent stays put, and a hidden Ballpark Sent stage receives nothing. Depending on when your company joined, Ballpark Sent may be hidden, and it may not show a lightning bolt.

The Projects board has no lightning bolts.

These moves happen on their own. For example, when you send a lead's proposal to the client, the lead moves to Proposal Sent and its Recent Activity logs the send.

Note: You choose where website leads land in the embed form settings, under Default Stage for New Leads. See Website Embed Form.


⭐ Best Practices

  • Empty a stage before you hide or delete it -- a hidden stage takes its leads or projects off the board.

  • Rename instead of deleting and recreating -- renaming keeps every lead and project where it is.

  • Use your team's own words -- any stage can be renamed, so match the names to what your team already says.

  • Keep the list short -- every extra column is one more place for a lead to sit unnoticed.

  • Check the switch when a column goes missing -- a missing column is usually a stage someone hid.

  • Use colour to make key stages stand out -- a distinct colour on stages that need action makes them easier to spot on a busy board.


ā“ Common Questions

Q: Can I rename the default stages?

A: Yes. Stages marked App Default can be renamed. Click the pencil, change the Stage Name and click Save Stage.


Q: Can I delete a default stage?

A: No. App Default stages show a lock instead of a trash icon. To take one off the board, turn off its switch.


Q: I hid a stage and its leads or projects disappeared. Where are they?

A: A hidden stage's cards don't show on the board. Currently, they still show in List view. Turn the stage's switch back on, then move them to the stage you want.


Q: Which stages move leads automatically?

A: New Lead, Estimating and Proposal Sent show a lightning bolt on the Leads board. Click it to see what moves leads into that stage. Ballpark Sent also moves leads in when a ballpark is sent, if the stage is shown. The Projects board has no lightning bolts.


Q: Who can change stages?

A: Users with Full Access on the Leads Pipeline or Projects Pipeline row in Settings > Permissions. Collaborate, View Only and Access Denied can't manage settings.


āš ļø Common Mistakes to Avoid

āŒ Don't

āœ… Do

Delete a custom stage that still has leads or projects in it

Move them to another stage first

Hide a stage that still has leads or projects in it

Move them to another stage first

Create a custom stage just to change a default stage's name

Rename the default stage

Look for a trash icon on App Default stages

Turn off their switch to hide them

Assume a missing column was deleted

Check each stage's switch in Settings

Did this answer your question?