đ Overview
A task list only works if everyone uses the same one. When the office keeps to-dos in a spreadsheet, the PM keeps them in their head and the field keeps them in a text thread, the follow-up call slips and the inspection gets booked a day late.
Tasks puts every to-do in one place. The Tasks page in the left sidebar holds your company's task boards, where you can see work as a List, a Board of stage columns or a Calendar. Each task can have an assignee, a due date, a priority, subtasks, reminders, comments and followers.
Every lead and project also has its own Tasks page in its module bar. Tasks you add there roll up to your company's task boards, so the main Tasks page shows every job's work in one place. A task you add on the main page and link to a lead or project shows inside that job too.
Each board has its own settings: its stages, custom fields that every task on it gets, and automations that act on tasks for you, such as moving late tasks to Overdue.
đ Understanding Tasks
⥠What It Does
Tasks allows you and your team to:
Keep work on boards -- with stages as columns, and templates for boards you set up often
Switch views -- List, Board or Calendar
Find the right tasks fast -- with saved views such as My tasks, plus search, Filter, Sort and Group
Plan the details -- assignee, due date, priority, labels, subtasks, attachments and linked items
Get reminded -- reminders and repeating tasks
Work together -- comments with @ mentions, and followers who hear about changes
Mark tasks for your client -- tasks on a lead or project can be set to Shared
Let the board do the routine work -- with automations and custom fields
Move tasks in and out -- import from CSV, export to PDF or CSV
đ When to Use It
Tasks is most valuable when you want to:
Give every follow-up, inspection and to-do an owner and a date
See what's overdue across the company at a glance
Keep a job's tasks with the job, inside its lead or project
Set up the same board and stages for a team, such as sales or dispatch
đ Step-by-Step Instructions
1. Open Tasks and Pick a Board
Click Tasks in the left sidebar
Click the board name at the top left (for example Default Board) to open the board list
The list has two tabs: Task Boards and Templates, each with a count. Search the list, click a board to open it, or click + New Task Board. Show All Task Boards opens the full list. A lock icon marks a private board.
To create a board, click + New Task Board. In Create New Task Board, choose Start From Scratch or Choose A Template. From scratch, enter a Name, turn on Private Board if "Only the members and groups below can see this board", and click Create Task Board.
To save a board as a template, click the three dots next to the board in the list and click Convert to Template. The same menu has Settings and Delete Board.
2. Read the Page
Along the top of the page:
A views dropdown, such as All open tasks
Search tasks
Filter, Sort, Group, Export, Import and Settings
List, Board and Calendar
New Task
On a smaller screen, Filter, Sort, Group, Export, Import and Settings are under Filter, sort & more (the three-dot button next to Search tasks).
Below them, five cards count the board's tasks: Overdue, Due today, Due this week, No due date and Completed. Click a card to show only those tasks. A chip such as Due: Overdue appears above the list, with Clear All and Save Current View. Click the x on the chip or Clear All to go back to every task.
Every task has a number, such as #21, shown on its card and in the # column.
3. Choose a View
Open the views dropdown:
All open tasks
My tasks -- the tasks assigned to you
Following -- tasks you follow
Created by me
Completed
Archived
Each view shows a count. To keep the filters and sorting you've set up, click + Save current as new view.
Then pick how to see them:
Board -- one column per stage, with a count on each. Type in Enter a task name... at the bottom of a column to add a task there
List -- columns #, Lead/Project, Title, Assignee, Priority, Status and Due Date, with an Open button on each row and + New Task at the bottom. The icon at the right end of the column headings opens Columns: turn each column on or off, drag to reorder, or click Compact all columns or Reset column widths
Calendar -- tasks on their due dates, by Month or Week, with Today, Overdue and Completed
4. Filter, Sort and Group
Click Filter, Sort or Group at the top of the page.
On a smaller screen, these are under Filter, sort & more. Each line there shows its current setting, such as Manual next to Sort. Click a line to open it, and use the back arrow to return to the menu.
Filter -- search by name, or tick options under STATUS, LEADS, PROJECTS, ASSIGNEES, LABELS, PRIORITY, CREATED BY and FOLLOWING. Clear all removes them
Sort -- Manual, Due date, Priority, Title, Lead/Project or Recently created
Group -- None, Status, Lead/Project, Assignee, Due date or Priority. "Groups show progress: tasks done of the total."
On a smaller screen, the Filter, sort & more button shows a count while a filter is on.
5. Create a Task
Click New Task
Type a Task Title and, if you like, a description
On the right, set Status (one of the board's stages), Assignee, Due, Priority, Lead / Project, Repeat, Reminders, Labels and Board
Add Subtasks, Linked items and Attachments (any file up to 25 MB) if you need them
Click Create Task
Due starts on today's date. Linked items need a lead or project first: "Set a lead / project to link items."
Assignee -- tick one or more people. With more than one, the field shows the count, such as 2 assignees
Subtasks -- type in Add a subtask and press Enter. Each subtask can have its own date (the calendar icon on its row). A subtask with no date of its own takes the task's due date
Priority -- High, Medium, Low or No priority
Repeat -- Does not repeat, Daily, Weekly, Monthly, Yearly or Custom...
Reminders -- On the day, 1 day before, 2 days before or 1 week before, at 9:00 AM. They're "sent to the assignee and followers by notification and email while the task is not complete."
Note: If you click Cancel after typing anything, Structur asks "Discard Changes?" Click Discard to close without saving.
Note: On the Default Board, Status can start on Overdue even when the due date is in the future. Pick the stage you want before you click Create Task.
6. Work on a Task
Click a card, or Open on a list row, to open the task. At the top you'll find Mark as Complete, Archive, Download and Follow.
Subtasks -- tick them off as you go, then click Save Changes. The count shows progress, such as 3/5
Comments -- write with the formatting toolbar, add emoji and @ mention a teammate, then click Send
Activity -- a record of changes to the task. Hover over your own comment to edit or delete it
Follow -- click it to follow the task. It changes to Following. Click again to stop
Change any field on the right, then click Save Changes.
Mark as Complete completes the task straight away, even if some subtasks aren't ticked. Those subtasks stay unticked. The task then shows "Completed by" with the person's name and the date, and the button reads Completed.
Repeating tasks: when you complete a task that repeats, Structur creates the next one with a new number. Its due date moves on by the repeat (a Weekly task due Nov 11 comes back due Nov 18), it keeps the same lead or project and repeat, and its subtasks come back unticked with the new date. The completed task moves to Completed.
7. Archive, Delete and Bulk Actions
To take a task off your boards, open it and click Archive, then Archive again to confirm. "It moves to Archived and leaves your boards. You can restore it from there at any time."
To find it, pick Archived in the views dropdown. The three dots on each row have Restore and Delete. A task can only be deleted after it's archived.
To change several tasks at once, switch to Board, hover over a card and tick its checkbox. A bar appears at the bottom with Move, Due Date, Assign, Priority, Labels, Client, Complete, Duplicate and Archive.
Note: The bar is on Board only. There's no way to select several tasks in List or Calendar.
8. Share a Task with Your Client
A task linked to a lead or project has a Client field on the right, set to Hidden or Shared.
Open the task
Click Hidden next to Client
The task is shared at once, and you'll see "Task shared with the client" with an Undo button. Click Shared to hide it again.
Note: Currently, the Client Portal doesn't have a Tasks page, so your client can't see shared tasks there yet.
Important: Clicking Hidden shares the task straight away, before you click Save Changes. Check the task is right for your client before you click.
9. Set Up a Board
Click Settings at the top of the page to open Board Settings ("Name, privacy and stages for" the board). On a smaller screen, Settings is under Filter, sort & more.
Board Name (required)
Default Project -- "New tasks created on this board are linked to this project."
Default Assignee -- "New tasks created on this board with nobody assigned go to this person."
Private Board -- "Only the members and groups below can see this board."
STAGES -- drag to reorder, rename, delete, hide or show each stage, and click New Stage. Each stage shows how many tasks it has
CUSTOM FIELDS -- click New Field to add a field every task on this board gets, "to track things like phase, cost or inspector on every task"
AUTOMATIONS -- the built-in Move Overdue Tasks Automatically ("Moves tasks past their due date to Overdue."), plus your own rules
Click Save Changes.
Overdue and Complete are system stages. Hiding a stage takes it and its tasks off the board and the list. They still show on the calendar, in the KPI cards and in CSV exports.
Note: Changes to stages apply when you click Save Changes. Custom fields and automation rules save as soon as you change them.
10. Add an Automation
A rule works in three parts: "When something happens, If the task matches, Then do something." Click New Rule to build one, or Use on a template:
When completed, notify the creator
When moved to Done, share with client -- "When a task moves to Complete, if it has a lead or project, share it with the client."
When overdue, set priority High
When created with label Punch, assign to...
"Rules run on their own when tasks on this board change."
11. Import and Export
Both are at the top of the page. On a smaller screen, they're under Filter, sort & more.
Export -- PDF..., CSV of what's shown (with a count) or CSV of the whole board
Import -- Import from CSV, or Download template to get a file in the right layout
12. Tasks Inside a Lead or Project
Open the lead or project
Click Tasks in the module bar (under Project Management)
You'll see only that job's tasks, with Due Today, Open, Overdue and Complete cards, All, Open, Complete and Overdue tabs, Search tasks..., a filter icon (filter by ASSIGNEE), and List or Calendar. The list has Assignees and Subtasks columns (such as 0 of 2). Export and New Task are at the top right.
A task you add here is linked to this job and also goes on a task board: the one in its Board field (Default Board unless you pick another). It shows on that board on the main Tasks page with the job's name on its card. To see one job's tasks on the main page, use Filter (under PROJECTS or LEADS) or Group by Lead/Project.
It's the same task in both places, so a change in one shows in the other.
Note: If Tasks isn't in the module bar, it may be hidden. Click Show/Hide Features at the right end of the module bar and turn Tasks back on.
13. Notifications and Permissions
Notifications: in Settings > Notifications, the Tasks section has Task assigned, Task marked as complete, Task overdue, Task reminder, Mentioned in a task comment, New comment on a task you are assigned to or follow, Daily task digest and Message from a board automation. Choose Web or Email for each.
Permissions: in Settings > Permissions, the Tasks row (under Project Management) covers tasks, and the Task Boards row covers boards and their settings. Archiving, restoring and deleting tasks need Full Access on the Task Boards row.
â Best Practices
Start your day from My tasks -- the full board shows everyone's work, and your own overdue items are easy to miss in it.
Link tasks to a lead or project -- a task with no project doesn't show in that job's Tasks, so the PM on the job won't see it.
Save the views you use every week -- a saved view keeps your filters, so you don't rebuild them.
Leave Move Overdue Tasks Automatically on -- late tasks land in Overdue without anyone moving them.
Use reminders instead of memory -- a reminder reaches the assignee and every follower until the task is done.
Check before you share -- clicking Hidden shares a task with your client at once.
â Common Questions
Q: What's the difference between Tasks in the left sidebar and Tasks inside a lead or project?
A: The Tasks page shows your company's task boards, with every job's tasks, views, board settings and automations. Tasks inside a lead or project shows only that job's tasks. A task added inside a job rolls up to a board on the main page, and it's the same task in both places.
Q: I completed a task. Where did it go?
A: Open the views dropdown and pick Completed. Inside a lead or project, use the Complete tab.
Q: How do I see only my tasks?
A: Pick My tasks in the views dropdown.
Q: Can I import tasks from a spreadsheet?
A: Yes. Click Import (on a smaller screen, it's under Filter, sort & more), then Import from CSV. Click Download template first to get a file in the right layout.
Q: Can my client see a task?
A: Not yet. Currently, the Client Portal doesn't have a Tasks page. You can still set a task's Client field to Shared (the task needs a lead or project), and an automation can share tasks when they move to Complete.
Q: Can I assign a task to more than one person?
A: Yes. Click Assignee and tick each person. The field then shows the count, such as 2 assignees.
Q: Does a subtask get a due date?
A: A subtask with no date of its own takes the task's due date. To give it a different date, use the calendar icon on the subtask's row.
Q: Can I complete a task while some subtasks are still open?
A: Yes. Mark as Complete completes the task without asking, and the open subtasks stay unticked. Tick them first if you want the task to show them as done.
Q: What happens when I complete a repeating task?
A: Structur creates the next task straight away, with a new number and the next due date (one week later for Weekly). It keeps the lead or project and the repeat, and its subtasks start unticked.
â ď¸ Common Mistakes to Avoid
â Don't | â Do |
Keep a job's tasks with no lead or project | Set Lead / Project so they show inside the job |
Rebuild the same filters every morning | Click + Save current as new view |
Move late tasks to Overdue by hand | Leave Move Overdue Tasks Automatically on |
Click Hidden to look at the sharing options | Know that it shares the task straight away |
Cancel a half-finished task without thinking | Read the Discard Changes? message before you click Discard |
Think Filter, Export or Settings are missing on a smaller screen | Click Filter, sort & more (the three-dot button) |
Tick subtasks and close the task | Click Save Changes so the ticks are kept |
